What Are Stuffing and Devanning? Container Packing and Unpacking Process
A container may contain the correct number of packages and total weight yet still suffer cargo collapse, packaging damage, load imbalance, seal disputes or injury when its doors are opened. Stuffing is not merely placing cargo inside a container, and devanning is not merely taking it out. Each is a controlled workflow with defined inputs, accountable parties, safety hold points and handover evidence. This article explains the difference, the process from container inspection to sealing and VGM, and the reverse process from seal verification to ventilation, unloading and exception reporting.
QUICK FACTS
Packing, stowing, distributing and securing cargo, ending with door closure, sealing and evidence.
Controlled opening, inspection and removal of cargo; also called unstuffing/stripping in some contexts.
Container condition, stow plan, load distribution, securing, seal, VGM, atmosphere and handover records.
Do not start unless cargo, equipment, people, work area, documents and exception handling are confirmed.
SCOPE OF APPLICATION
Applies to dry, refrigerated and special containers in FCL, LCL, CY–CY, CFS and multimodal operations. It focuses on operational control and safety and does not replace carrier, terminal, warehouse, IMDG or national requirements.
KEY TERMS
| Term | Meaning | Operational role |
|---|---|---|
| Stuffing / Packing | Loading cargo into a CTU/container, including distribution, dunnage, blocking, bracing and securing. | Creates a transport-ready cargo unit. |
| Devanning / Unstuffing | Removing cargo after checking container, seal, cargo and atmosphere. | Returns cargo to warehouse status and records exceptions. |
| Stripping | Common terminal/CFS term for removing cargo from a container. | Often equivalent to devanning, subject to local SOP. |
| Dunnage | Support, separation or void-filling material. | Spreads load and reduces movement. |
| Blocking & Bracing | Physical restraint using suitable material or structures. | Restrains movement in relevant directions. |
| Seal | Numbered container security device. | Access-control evidence, not proof of cargo completeness. |
| VGM | Verified Gross Mass of a packed container. | SOLAS data for ship stow planning. |
OPERATING PRINCIPLE
Stuffing creates a complete transport unit in which cargo, packaging, pallets, securing material and the container must behave as a stable system throughout the journey. Devanning reverses that condition but cannot be treated as simple package removal: cargo may have shifted, doors may be under pressure, the atmosphere may be toxic or oxygen-deficient, fumigants may remain and packages may leak. Both processes should use the same master dataset: container number, seal number, package list, mass, stow plan, DG/reefer status and photographic evidence.
ANALYSIS / COMPARISON
| Criterion | Stuffing | Devanning | Shared control |
|---|---|---|---|
| Objective | Create a stable, compliant, transport-ready unit. | Remove cargo safely and preserve condition evidence. | Correct cargo/container/documents under supervision. |
| Start | Inspected empty container and ready cargo. | Container stabilized at unloading point and seal checked. | Safe work area, lighting and equipment. |
| Main risks | Overload, imbalance, poor securing, wrong seal/VGM. | Cargo fall-out, harmful atmosphere, leakage, shortage. | Stop when actual conditions differ from plan. |
| Evidence | EIR, photos, loading tally, seal record, VGM. | Seal/door photos, unloading tally, exception report. | Timestamp, operator, container/seal and shipment ID. |
| Completion | Doors secured, seal recorded, VGM submitted, handover done. | Cargo segregated, exceptions recorded, empty checked. | Records support claims and audits. |
DOCUMENTS AND DATA TO CHECK
| Data/document | Prepared or issued by | When used | Fields that must match |
|---|---|---|---|
| Booking / Shipping instruction | Shipper, forwarder, carrier | Before stuffing | Container type, cut-off, cargo, ports, DG/reefer instruction. |
| Packing list / Cargo list | Cargo owner | Stow plan and tally | Packages, weights, dimensions, marks, batch/lot. |
| EIR / condition record | Depot, carrier, trucker or warehouse | Empty pickup/return | Container number, pre-existing damage, cleanliness. |
| Stowage & securing plan | Warehouse/cargo owner/packer | Before and during stuffing | Package locations, point loads, securing points. |
| Seal record | Sealing party | After door closure | Seal number, time, person, door photos. |
| VGM record | Shipper remains responsible; weighing or authorized parties may support under applicable rules | After stuffing, before cut-off | Cargo + pallets/dunnage/securing + tare of the specific container; method and authorized signatory. |
| Arrival/DO/warehouse instruction | Carrier/forwarder/consignee/warehouse | Before devanning | Container, seal, time, place. |
| Tally & exception report | Warehouse/CFS/consignee/surveyor | During/after devanning | Received packages, wet/damaged, shortage/overage, photos. |
PROCESS / APPLICATION
A. STUFFING PROCESS
| Stuffing step | Input | Main action | Output/hold point |
|---|---|---|---|
| 1. Confirm plan | Booking, cargo list, stow plan, resources | Lock box type, packages, mass, DG, weather and cut-offs. | No packing if critical data is missing. |
| 2. Inspect empty container | Container/EIR/CSC plate | Check structure, floor, roof, doors, holes, cleanliness, dryness, odour, pests and locking. | Accept or replace. |
| 3. Prepare cargo/materials | Cargo, pallets, dunnage, lashings | Verify packages, measure/weigh and group heavy/fragile/DG/reefer cargo. | Cargo and materials released. |
| 4. Load/distribute weight | Stow plan | Heavy cargo low; avoid eccentric loading; control floor/point load; preserve airflow if needed. | Within equipment limits. |
| 5. Block/brace/secure | Dunnage and securing gear | Fill voids and restrain all relevant movement using suitable points. | No dangerous movement expected. |
| 6. Final check/close | Tally, photos, plan | Count, photograph, remove debris, check locking bars, apply seal. | Seal record complete. |
| 7. Establish VGM/handover | Weighing data, tare, documents | Use accepted method; submit before cut-off; hand over. | Valid VGM and complete file. |
B. DEVANNING PROCESS
| Devanning step | Input | Main action | Output/hold point |
|---|---|---|---|
| 1. Prepare unloading position | DO, warehouse plan, equipment | Stable ground, immobilize vehicle, exclusion zone. | No work if vehicle is unstable. |
| 2. Inspect exterior/seal | Container, seal, documents | Match numbers, photograph, check dents, leakage, bulging doors, fumigation/tampering. | Quarantine serious exceptions. |
| 3. Assess before opening | SDS/DG/fumigation/journey data | Stand clear of the fall zone, restrain doors if needed and assess shifted cargo. For CTUs using cooling or conditioning substances, or where a harmful atmosphere is suspected, the atmosphere should be verified by measurement before opening. | Open only under a controlled method; quarantine and seek specialist advice if conditions are not confirmed. |
| 4. Ventilate/open | PPE, ventilation/gas testing | Avoid direct contact with the initial air release and keep people out. Every CTU should be ventilated before entry, preferably by forced ventilation, and permit entry only when the risk assessment or measurements allow it. | Entry conditions are safe and door-end cargo is visible. |
| 5. Unload in sequence | Stow plan/tally | Unload layer by layer, maintain stability, avoid blind pulling, use correct equipment. | Continuous tally. |
| 6. Segregate/document | Packing list, QC, photos | Separate sound, damaged, wet, short/over or leaking cargo; preserve evidence. | Exception report complete. |
| 7. Close out/empty return | Empty return instruction | Clean as agreed, record new damage, return to instructed place/time. | Devanning file closed. |
RISKS AND COMMON FAILURES
| Common failure | Cause | Impact | Control |
|---|---|---|---|
| CBM selection ignores point load | Only volume and total kg considered. | Floor damage, deformation or rejection. | Check payload, MGW, footprint and distribution. |
| No stow plan | Experience-only packing. | Unsafe unloading and poor shortage traceability. | Approve plan and locations. |
| Weak seal process | No photos/time/operator. | Weak audit trail. | Full seal record. |
| VGM misses pallets/dunnage or wrong tare | Incomplete weighing dataset. | Unsafe stow plan or non-loading. | Accepted method and actual tare. |
| Both doors opened immediately | No shifted-load assessment. | Door impact, cargo fall-out, injury. | Controlled opening from safe position. |
| Entry before ventilation | Fumigant or cargo vapour not recognized. | Poisoning or asphyxiation. | Every CTU should be ventilated before entry; test where cooling/conditioning substances, fumigation or suspicious signs are present; use suitable PPE. |
| Damage not recorded immediately | Speed prioritized. | Claim evidence lost. | Stop, photograph, segregate, report. |
| Sound/suspect cargo mixed | No quarantine status. | Traceability loss/contamination. | Quarantine zone and status code. |
REFERENCES AND OFFICIAL SOURCES
| Source | Operational role | Status/note |
|---|---|---|
| IMO/ILO/UNECE CTU Code | Practice framework for packing, securing, receiving and unpacking CTUs. | Non-mandatory; 2014 baseline while revision work continues. |
| SOLAS VGM – IMO | Shipper responsibility, verification methods and loading condition. | Required for stow planning but not an entitlement to load. |
| IMO Cargo Securing and Packing | Planning, execution and supervision principles. | Competent personnel and voyage-appropriate securing. |
| CTU Code – Unpacking precautions | Cargo fall-out, harmful atmosphere, fumigation and ventilation. | Assess hazards before opening; ventilate before entry and measure the atmosphere where required. |
| IMDG Code 2024, Amendment 42-24 | Mandatory packaged dangerous-goods requirements at sea. | Mandatory from 1 January 2026; check UN number. |
| IMO – Safe transport of containers | Relationship among SOLAS, CSC, IMDG and CTU Code. | Identifies equipment, cargo and transport safety layers. |
FREQUENTLY ASKED QUESTIONS
Is stuffing only physical loading?
No. It includes box inspection, stow planning, load distribution, securing, tally, sealing and VGM.
Are devanning and stripping the same?
Often close in terminal/CFS use, but scope and records depend on contract/SOP.
Who is responsible for VGM?
Under SOLAS, the shipper named on the transport document is responsible for providing VGM, even if another party weighs.
Does an intact seal prove no shortage?
No. Quantity and condition still require tally, documents, photos and exception reports.
Can doors be opened immediately?
Only after vehicle stability, container/seal checks and assessment of door pressure, leakage, fumigation or harmful atmosphere.
Should ordinary cargo be ventilated?
Yes. The CTU Code recommends ventilating every CTU before personnel enter, preferably by forced ventilation; duration and gas testing depend on the risk assessment.
What if wet/broken packages are found?
Stop, photograph, preserve location/evidence, segregate and notify relevant parties.

NEED TO REVIEW IMPORT PROCEDURES OR A SHIPPING PLAN?
Send us the product name, shipping route, current dossier, or implementation request in advance so we can suggest a suitable approach that is practical, focused, and aligned with your shipment.
Exporting PET Bottle Blow-Moulding Machines from Vietnam: HS, Documents and Shipping
Exporting Capping Machines from Vietnam: HS, Origin, Documents and Shipping
PLASTIC PELLET MIXER EXPORT PROCEDURE: HS, MARKETS, ORIGIN AND SHIPPING
THERMOFORMING MACHINE EXPORT PROCEDURE: HS, ORIGIN, MARKETS & TRANSPORT
PLASTIC CRUSHER EXPORT PROCEDURE: MARKETS, HS, ORIGIN AND TRANSPORT
Exporting plastic injection moulding machines: HS, origin, markets and shipping
EXPORTING PLASTIC INJECTION MOULDING MACHINES FROM VIETNAM: MARKETS, HS, ORIGIN AND SHIPPING
PLASTIC EXTRUDER EXPORT PROCEDURE: HS, ORIGIN, MARKETS AND OPERATIONS
VFFS Vertical Packaging Machine Export Procedures: Markets, HS, Origin and Transport
EXPORTING HORIZONTAL HFFS PACKAGING MACHINES FROM VIETNAM: MARKETS, HS, ORIGIN AND SHIPPING
EXPORT GUIDE FOR FILLING MACHINES: MARKETS, HS, ORIGIN AND TRANSPORT
Labelling Machine Export Guide: Markets, HS, Origin, Compliance and Transport
EXPORTING HEAT-SHRINK WRAPPING MACHINES FROM VIETNAM: MARKETS, HS, ORIGIN AND SHIPPING
Exporting shuttle looms from Vietnam: markets, HS, origin and shipping
EXPORT GUIDE FOR FABRIC STENTER / HEAT-SETTING MACHINES: MARKETS, HS, ORIGIN AND TRANSPORT