How to Check Free Time Terms in a Shipping Line Quotation

FREIGHT CHARGES

HOW TO CHECK FREE TIME TERMS IN A SHIPPING LINE QUOTATION

A quotation stating “7 days free time” does not tell an importer or exporter which charge is waived, when the clock starts, or when it ends. Unless demurrage, detention, storage, day-count convention and equipment scope are separated, procurement may believe the cost is controlled while operations still incur daily charges. This guide provides a container-level method to verify free-time terms before confirming a booking.

QUICK FACTS

Never approve one number alone

Free time must be tied to a charge, direction, location, equipment, effective basis and start/end events.

Separate the clocks

DEM, DET and Storage may be separate or merged; D&D free time does not automatically waive Storage.

Confirm the day type

Calendar days include consecutive days; working days exclude non-working days under local rules.

Lock documentary evidence

The final term should appear in a quotation, booking confirmation, service contract or traceable written approval.

SCOPE OF APPLICATION

This guide applies to import and export FCL ocean shipments, including dry, reefer, special equipment and NOR where allowed by the tariff. It addresses carrier equipment use and time at ports, terminals, ICDs and depots. It does not replace the specific tariff of a carrier, terminal, depot or service contract.

Limitation: LCL, breakbulk, charter, shipper-owned containers and CFS storage may follow different mechanisms.

KEY TERMS

Term Operational meaning What to verify
Free Time The agreed period during which specified D&D charges are not payable. Whether it covers DEM, DET, merged D&D and/or Storage.
Demurrage – DEM Charge when the carrier’s container remains inside a port, terminal or depot beyond free time. Start event and the gate-out/load-on-board event that stops the clock.
Detention – DET Charge when carrier equipment remains outside the port/terminal/depot beyond free time. Gate-out/pick-up event and empty return/full gate-in event.
Combined D&D Demurrage and detention merged into one continuous period. Total days and exact start/end events.
Storage Ground-use charge assessed by a terminal, ICD, depot, warehouse or carrier. Who collects it and whether it is included or separate.
Last Free Day – LFD The final day within the free period for one specific clock. Do not use one LFD for separate DEM, DET and Storage clocks.
Calendar / Working Day Consecutive days / eligible working days under local rules. Treatment of weekends, holidays and terminal closures.

COMMERCIAL MECHANISM

Free Time is a commercial condition linked to equipment and infrastructure use. A shipment may simultaneously be subject to a quotation, booking confirmation, service contract, SPOT terms and an incorporated tariff. Do not assume that one document always prevails; identify the governing document, effective version and accepted terms for the specific booking.

Control principle: one Free Time record per container: charge code + direction + location + equipment + counting basis + start event + end event + free days + rate slabs + governing document.

CMA CGM states that merged D&D does not automatically include Storage or reefer services unless the country tariff says so. By contrast, Maersk Vietnam’s current import tariff defines Demurrage as including terminal storage costs. This difference demonstrates why the carrier-, location- and shipment-specific tariff must be checked instead of relying on a generic definition.

12-FIELD VERIFICATION MATRIX

Field Question Preferred evidence Risk if omitted
Direction Import or export? Quotation/booking Wrong operational events.
Mechanism Separate DEM/DET or merged D&D? Tariff/booking terms Wrong day allocation.
Free days How many for each charge? Booking confirmation One number applied to all charges.
Day type Calendar or working days? Is the start event Day 1, or does Day 1 begin on the next day? Are partial days charged? Tariff footnote One-day LFD error or incorrect treatment of weekends and holidays.
Start event Discharge, availability, release, gate-out or empty pick-up? Definition Incorrect LFD.
End event Full gate-out, empty return, full gate-in or load-on-board? Definition No clear clock-stopping action.
Location Port, terminal, ICD, rail ramp or depot? Routing/booking Wrong local tariff.
Equipment 20/40/45, dry/reefer/special/NOR? Booking Special equipment terms missed.
Storage Included or separate; who bills it? Carrier/terminal tariff Unbudgeted ground rent.
Rate slabs What charges apply after free time? Effective tariff No delay-cost forecast.
Effective basis PCD, booking date, discharge or another date? Validity/PCD Obsolete tariff used.
Exceptions Are holds, terminal/depot closures, rollovers or vessel changes excluded, extended or eligible for relief? Terms/written approval Disputes during disruption.

IMPORT VERSUS EXPORT FREE TIME

Direction Clock Typical period Control action
Import – Demurrage Full container inside terminal Discharge/availability/release to full gate-out Prepare D/O, customs, permits and trucking before LFD.
Import – Detention Container outside terminal Full gate-out to empty return Plan unloading and empty-return depot.
Import – Combined D&D One continuous clock Discharge to empty return Control pickup, unloading and return as one cycle.
Export – Detention Empty equipment outside depot Empty pick-up to full gate-in Do not collect equipment before cargo is ready.
Export – Demurrage Full container inside terminal Full gate-in to load-on-board Control CY cut-off, rollover and ETD changes.
Export – Combined D&D One continuous clock Empty pick-up to load-on-board Work backwards from cut-off and ETD.

DOCUMENTS AND DATA TO CHECK

Document/data Issuer/owner Use Fields to reconcile
Quotation Carrier/NVOCC/forwarder Supplier selection Scope, validity, days, day type, exclusions.
Booking Confirmation Carrier/NVOCC After booking Vessel/voyage, equipment, terminal, SPOT/contract terms.
Service Contract Carrier and customer Contract rate shipments Named account, route, commodity, effective period.
D&D Tariff Carrier Standard reference Country, direction, location, equipment, effective date.
Terminal/Depot Tariff Terminal/ICD/depot Storage review Storage days, counting basis, pass-through charges.
Tracking Events Carrier/terminal systems Actual calculation Discharge, availability, gate-out, empty return, load-on-board.
Written exception approval Carrier/forwarder Extensions/waivers Booking/container, extra days, purchase price and conditions.

SEVEN-STEP PRE-BOOKING REVIEW

1

Define the shipment scope

Record POL/POD, terminal, direction, equipment, commodity, expected ETD/ETA and haulage plan.

2

Separate charge codes

Require DEM, DET/merged D&D, Storage and reefer services to be shown separately.

3

Confirm day counting

Confirm calendar or working days, whether the start event is Day 1 or Day 0, and whether a partial day is charged in full.

4

Confirm start/end events

Write the exact event that starts and stops every clock.

5

Match the effective tariff

Verify country, location, equipment, effective date, PCD and governing rate condition.

6

Calculate test LFDs

Model a normal schedule and a weekend/holiday/rollover scenario, with a separate LFD per charge.

7

Archive acceptance evidence

Retain the quotation, booking confirmation, tariff/version and approval emails with the booking/container reference; obtain written confirmation of precedence where documents differ.

CALCULATING LAST FREE DAY

Do not calculate LFD by mechanically adding days to ETA. First identify the correct start event, day type and Day 1/Day 0 rule in the applicable tariff.

If the start event is Day 1: LFD is the Nth eligible day counted from the start event; for calendar days, this equals start date + (N − 1) days.
If the following day is Day 1: LFD is the Nth eligible day after the start event; for calendar days, this equals start date + N days.
For working days: count only days treated as working days under the tariff; do not derive the result by ordinary calendar-day addition.

The first chargeable day is usually the next chargeable day after LFD under the same day-count basis. Some tariffs charge every day or part thereof in full, so event timestamps, cut-offs and partial-day rules must also be checked.

Operational example: where import Demurrage “commences on and includes the day of discharge,” discharge is Day 1; where Detention starts “on and includes full gate-out,” gate-out may also be Day 1. Never transfer the DEM LFD to DET where the clocks are separate.

HOW TO READ QUOTATION WORDING

Wording Assessment Missing information
“7 days free time” Insufficient Charge, day type, start/end, equipment and location.
“7 calendar days combined D&D, import dry” Basic mechanism is clear Start/end events, Storage, effective basis and rate slabs.
“DEM 5 days + DET 3 days” Clocks are separated Day 1, events, Storage and terminal/depot.
“As per carrier tariff” Budget not locked Carrier, tariff version/link, location and PCD.
“Special free time subject to approval” Not yet effective Approver, deadline, purchase price and written evidence.

RISKS AND COMMON ERRORS

Error Cause Impact Control
Using ETA for every LFD Start event not reviewed Wrong deadline Use actual carrier/terminal event.
Combining DEM, DET and Storage Short quotation wording Incomplete budget Build a charge matrix.
Ignoring calendar days Assuming business days Weekend/holiday charges Record day type.
Applying one term to all containers Equipment/location not checked Reefer/special exceptions Track each container.
Relying only on public tariff SPOT/contract not reviewed Wrong governing term Archive shipment-specific terms.
No written extension approval Verbal confirmation Weak dispute evidence Obtain booking-referenced approval.
No update after rollover Schedule change Longer export D&D Monitor ETD/cut-off and request confirmation.

OFFICIAL SOURCES AND LEGAL SCOPE

Source Scope Use
CMA CGM – General D&D Terms Carrier terms Definitions, events and calendar/working-day conventions.
Maersk Vietnam – Import / Export Local information, effective until changed on the page Check start/end events, calendar days, PCD, equipment, Storage treatment and SPOT terms.
Hapag-Lloyd – D&D Tariffs Country tariff portal Current tariff and additional free time.
FMC – U.S. D&D billing update United States jurisdiction only Invoice-content and issuance-deadline reference.
United States note: the 2025 court decision set aside only 46 C.F.R. 541.4; the remaining FMC billing requirements continue in effect. They are not universal rules for non-U.S. shipments.

FAQ

Does “7 free days” automatically cover both DEM and DET?

No. Verify whether the term is separate or merged D&D.

Does D&D free time include Storage?

Only when the tariff or quotation expressly says so.

Is ETA always the demurrage start date?

No. The governing term may use discharge, availability, release or another event.

Are weekends and holidays excluded?

Only under the applicable working-day convention; calendar days normally run consecutively.

Do SPOT bookings use the public standard tariff?

Not necessarily. Accepted SPOT or booking conditions may differ.

Can separate DEM and DET days be added together?

Not as one flexible pool unless the term expressly provides combined D&D.

When should extra free time be purchased?

Before booking or the carrier’s deadline, after modelling customs, unloading, delivery and empty return.

APPLICATION NOTE: Actual terms depend on the carrier/NVOCC, country, terminal/depot, direction, equipment, service contract, SPOT terms, PCD and actual events. Where documents differ, require written confirmation of which document governs the specific booking; do not assume that a quotation always overrides a tariff or vice versa.
QUICK CONSULTATION

NEED TO REVIEW IMPORT PROCEDURES OR A SHIPPING PLAN?

Send us the product name, shipping route, current dossier, or implementation request in advance so we can suggest a suitable approach that is practical, focused, and aligned with your shipment.

CALL NOW
Zalo
HOTLINE 0963 856 664 / 0982 135 393
EMAIL info@tgimex.com
SUITABLE FOR International shipping · Customs procedures · Import licenses · B2B logistics