HOW TO CHECK FREE TIME TERMS IN A SHIPPING LINE QUOTATION
A quotation stating “7 days free time” does not tell an importer or exporter which charge is waived, when the clock starts, or when it ends. Unless demurrage, detention, storage, day-count convention and equipment scope are separated, procurement may believe the cost is controlled while operations still incur daily charges. This guide provides a container-level method to verify free-time terms before confirming a booking.
QUICK FACTS
Free time must be tied to a charge, direction, location, equipment, effective basis and start/end events.
DEM, DET and Storage may be separate or merged; D&D free time does not automatically waive Storage.
Calendar days include consecutive days; working days exclude non-working days under local rules.
The final term should appear in a quotation, booking confirmation, service contract or traceable written approval.
SCOPE OF APPLICATION
This guide applies to import and export FCL ocean shipments, including dry, reefer, special equipment and NOR where allowed by the tariff. It addresses carrier equipment use and time at ports, terminals, ICDs and depots. It does not replace the specific tariff of a carrier, terminal, depot or service contract.
KEY TERMS
| Term | Operational meaning | What to verify |
|---|---|---|
| Free Time | The agreed period during which specified D&D charges are not payable. | Whether it covers DEM, DET, merged D&D and/or Storage. |
| Demurrage – DEM | Charge when the carrier’s container remains inside a port, terminal or depot beyond free time. | Start event and the gate-out/load-on-board event that stops the clock. |
| Detention – DET | Charge when carrier equipment remains outside the port/terminal/depot beyond free time. | Gate-out/pick-up event and empty return/full gate-in event. |
| Combined D&D | Demurrage and detention merged into one continuous period. | Total days and exact start/end events. |
| Storage | Ground-use charge assessed by a terminal, ICD, depot, warehouse or carrier. | Who collects it and whether it is included or separate. |
| Last Free Day – LFD | The final day within the free period for one specific clock. | Do not use one LFD for separate DEM, DET and Storage clocks. |
| Calendar / Working Day | Consecutive days / eligible working days under local rules. | Treatment of weekends, holidays and terminal closures. |
COMMERCIAL MECHANISM
Free Time is a commercial condition linked to equipment and infrastructure use. A shipment may simultaneously be subject to a quotation, booking confirmation, service contract, SPOT terms and an incorporated tariff. Do not assume that one document always prevails; identify the governing document, effective version and accepted terms for the specific booking.
CMA CGM states that merged D&D does not automatically include Storage or reefer services unless the country tariff says so. By contrast, Maersk Vietnam’s current import tariff defines Demurrage as including terminal storage costs. This difference demonstrates why the carrier-, location- and shipment-specific tariff must be checked instead of relying on a generic definition.
12-FIELD VERIFICATION MATRIX
| Field | Question | Preferred evidence | Risk if omitted |
|---|---|---|---|
| Direction | Import or export? | Quotation/booking | Wrong operational events. |
| Mechanism | Separate DEM/DET or merged D&D? | Tariff/booking terms | Wrong day allocation. |
| Free days | How many for each charge? | Booking confirmation | One number applied to all charges. |
| Day type | Calendar or working days? Is the start event Day 1, or does Day 1 begin on the next day? Are partial days charged? | Tariff footnote | One-day LFD error or incorrect treatment of weekends and holidays. |
| Start event | Discharge, availability, release, gate-out or empty pick-up? | Definition | Incorrect LFD. |
| End event | Full gate-out, empty return, full gate-in or load-on-board? | Definition | No clear clock-stopping action. |
| Location | Port, terminal, ICD, rail ramp or depot? | Routing/booking | Wrong local tariff. |
| Equipment | 20/40/45, dry/reefer/special/NOR? | Booking | Special equipment terms missed. |
| Storage | Included or separate; who bills it? | Carrier/terminal tariff | Unbudgeted ground rent. |
| Rate slabs | What charges apply after free time? | Effective tariff | No delay-cost forecast. |
| Effective basis | PCD, booking date, discharge or another date? | Validity/PCD | Obsolete tariff used. |
| Exceptions | Are holds, terminal/depot closures, rollovers or vessel changes excluded, extended or eligible for relief? | Terms/written approval | Disputes during disruption. |
IMPORT VERSUS EXPORT FREE TIME
| Direction | Clock | Typical period | Control action |
|---|---|---|---|
| Import – Demurrage | Full container inside terminal | Discharge/availability/release to full gate-out | Prepare D/O, customs, permits and trucking before LFD. |
| Import – Detention | Container outside terminal | Full gate-out to empty return | Plan unloading and empty-return depot. |
| Import – Combined D&D | One continuous clock | Discharge to empty return | Control pickup, unloading and return as one cycle. |
| Export – Detention | Empty equipment outside depot | Empty pick-up to full gate-in | Do not collect equipment before cargo is ready. |
| Export – Demurrage | Full container inside terminal | Full gate-in to load-on-board | Control CY cut-off, rollover and ETD changes. |
| Export – Combined D&D | One continuous clock | Empty pick-up to load-on-board | Work backwards from cut-off and ETD. |
DOCUMENTS AND DATA TO CHECK
| Document/data | Issuer/owner | Use | Fields to reconcile |
|---|---|---|---|
| Quotation | Carrier/NVOCC/forwarder | Supplier selection | Scope, validity, days, day type, exclusions. |
| Booking Confirmation | Carrier/NVOCC | After booking | Vessel/voyage, equipment, terminal, SPOT/contract terms. |
| Service Contract | Carrier and customer | Contract rate shipments | Named account, route, commodity, effective period. |
| D&D Tariff | Carrier | Standard reference | Country, direction, location, equipment, effective date. |
| Terminal/Depot Tariff | Terminal/ICD/depot | Storage review | Storage days, counting basis, pass-through charges. |
| Tracking Events | Carrier/terminal systems | Actual calculation | Discharge, availability, gate-out, empty return, load-on-board. |
| Written exception approval | Carrier/forwarder | Extensions/waivers | Booking/container, extra days, purchase price and conditions. |
SEVEN-STEP PRE-BOOKING REVIEW
Define the shipment scope
Record POL/POD, terminal, direction, equipment, commodity, expected ETD/ETA and haulage plan.
Separate charge codes
Require DEM, DET/merged D&D, Storage and reefer services to be shown separately.
Confirm day counting
Confirm calendar or working days, whether the start event is Day 1 or Day 0, and whether a partial day is charged in full.
Confirm start/end events
Write the exact event that starts and stops every clock.
Match the effective tariff
Verify country, location, equipment, effective date, PCD and governing rate condition.
Calculate test LFDs
Model a normal schedule and a weekend/holiday/rollover scenario, with a separate LFD per charge.
Archive acceptance evidence
Retain the quotation, booking confirmation, tariff/version and approval emails with the booking/container reference; obtain written confirmation of precedence where documents differ.
CALCULATING LAST FREE DAY
Do not calculate LFD by mechanically adding days to ETA. First identify the correct start event, day type and Day 1/Day 0 rule in the applicable tariff.
The first chargeable day is usually the next chargeable day after LFD under the same day-count basis. Some tariffs charge every day or part thereof in full, so event timestamps, cut-offs and partial-day rules must also be checked.
Operational example: where import Demurrage “commences on and includes the day of discharge,” discharge is Day 1; where Detention starts “on and includes full gate-out,” gate-out may also be Day 1. Never transfer the DEM LFD to DET where the clocks are separate.
HOW TO READ QUOTATION WORDING
| Wording | Assessment | Missing information |
|---|---|---|
| “7 days free time” | Insufficient | Charge, day type, start/end, equipment and location. |
| “7 calendar days combined D&D, import dry” | Basic mechanism is clear | Start/end events, Storage, effective basis and rate slabs. |
| “DEM 5 days + DET 3 days” | Clocks are separated | Day 1, events, Storage and terminal/depot. |
| “As per carrier tariff” | Budget not locked | Carrier, tariff version/link, location and PCD. |
| “Special free time subject to approval” | Not yet effective | Approver, deadline, purchase price and written evidence. |
RISKS AND COMMON ERRORS
| Error | Cause | Impact | Control |
|---|---|---|---|
| Using ETA for every LFD | Start event not reviewed | Wrong deadline | Use actual carrier/terminal event. |
| Combining DEM, DET and Storage | Short quotation wording | Incomplete budget | Build a charge matrix. |
| Ignoring calendar days | Assuming business days | Weekend/holiday charges | Record day type. |
| Applying one term to all containers | Equipment/location not checked | Reefer/special exceptions | Track each container. |
| Relying only on public tariff | SPOT/contract not reviewed | Wrong governing term | Archive shipment-specific terms. |
| No written extension approval | Verbal confirmation | Weak dispute evidence | Obtain booking-referenced approval. |
| No update after rollover | Schedule change | Longer export D&D | Monitor ETD/cut-off and request confirmation. |
OFFICIAL SOURCES AND LEGAL SCOPE
| Source | Scope | Use |
|---|---|---|
| CMA CGM – General D&D Terms | Carrier terms | Definitions, events and calendar/working-day conventions. |
| Maersk Vietnam – Import / Export | Local information, effective until changed on the page | Check start/end events, calendar days, PCD, equipment, Storage treatment and SPOT terms. |
| Hapag-Lloyd – D&D Tariffs | Country tariff portal | Current tariff and additional free time. |
| FMC – U.S. D&D billing update | United States jurisdiction only | Invoice-content and issuance-deadline reference. |
FAQ
Does “7 free days” automatically cover both DEM and DET?
No. Verify whether the term is separate or merged D&D.
Does D&D free time include Storage?
Only when the tariff or quotation expressly says so.
Is ETA always the demurrage start date?
No. The governing term may use discharge, availability, release or another event.
Are weekends and holidays excluded?
Only under the applicable working-day convention; calendar days normally run consecutively.
Do SPOT bookings use the public standard tariff?
Not necessarily. Accepted SPOT or booking conditions may differ.
Can separate DEM and DET days be added together?
Not as one flexible pool unless the term expressly provides combined D&D.
When should extra free time be purchased?
Before booking or the carrier’s deadline, after modelling customs, unloading, delivery and empty return.
Tiếng Việt
中文 (中国)
NEED TO REVIEW IMPORT PROCEDURES OR A SHIPPING PLAN?
Send us the product name, shipping route, current dossier, or implementation request in advance so we can suggest a suitable approach that is practical, focused, and aligned with your shipment.
Form E, Form D, Form AK, Form VK and EUR.1: Key Differences
Principles for Determining HS Codes for Import and Export Goods
What Documents Should a Shipment Pre-alert Include?
Why Can’t Import Duty Be Determined from a Trade Name Alone?
Third-Party Invoicing on Proof of Origin: Conditions and Records to Review
Common Errors That Cause Import–Export Documents to Mismatch
How do MFN tariffs and special preferential import tariffs differ?
When a Certificate of Origin May Be Rejected During Import Customs Clearance
What Is an AEO Priority Enterprise? Conditions and Customs-Clearance Benefits
What Information Should a Packing List Contain?
What Is a Commercial Invoice? Mandatory Information and Common Errors
HBL vs MBL: Key Differences and How to Reconcile Bills of Lading
Sea Waybill vs Surrendered Bill vs Original Bill: What Is the Difference?
Advance Determination of HS Code, Customs Value and Origin: Procedure and Legal Use
How to Handle Cargo Surplus, Shortage or Mismatch with Customs Documents