How to Check Free Time Terms in a Shipping Line Quotation

FREIGHT CHARGES

HOW TO CHECK FREE TIME TERMS IN A SHIPPING LINE QUOTATION

A quotation stating “7 days free time” does not tell an importer or exporter which charge is waived, when the clock starts, or when it ends. Unless demurrage, detention, storage, day-count convention and equipment scope are separated, procurement may believe the cost is controlled while operations still incur daily charges. This guide provides a container-level method to verify free-time terms before confirming a booking. The sections below move from the underlying concept to its use in shipment documents and coordination among operational parties. In practice, businesses should reconcile booking, transport, commercial, and customs data early, assign a clear owner and response deadline, and retain the evidence supporting each material decision.

QUICK FACTS

Never approve one number alone

Free time must be tied to a charge, direction, location, equipment, effective basis and start/end events.

Separate the clocks

DEM, DET and Storage may be separate or merged; D&D free time does not automatically waive Storage.

Confirm the day type

Calendar days include consecutive days; working days exclude non-working days under local rules.

Lock documentary evidence

The final term should appear in a quotation, booking confirmation, service contract or traceable written approval.

Illustration for How to Check Free Time Terms in a Shipping Line Quotation
Illustration of the logistics topic, document or operation discussed in the article.

SCOPE OF APPLICATION

This guide applies to import and export FCL ocean shipments, including dry, reefer, special equipment and NOR where allowed by the tariff. It addresses carrier equipment use and time at ports, terminals, ICDs and depots. It does not replace the specific tariff of a carrier, terminal, depot or service contract.

Limitation: LCL, breakbulk, charter, shipper-owned containers and CFS storage may follow different mechanisms.

KEY TERMS

TermOperational meaningWhat to verify
Free TimeThe agreed period during which specified D&D charges are not payable.Whether it covers DEM, DET, merged D&D and/or Storage.
Demurrage – DEMCharge when the carrier’s container remains inside a port, terminal or depot beyond free time.Start event and the gate-out/load-on-board event that stops the clock.
Detention – DETCharge when carrier equipment remains outside the port/terminal/depot beyond free time.Gate-out/pick-up event and empty return/full gate-in event.
Combined D&DDemurrage and detention merged into one continuous period.Total days and exact start/end events.
StorageGround-use charge assessed by a terminal, ICD, depot, warehouse or carrier.Who collects it and whether it is included or separate.
Last Free Day – LFDThe final day within the free period for one specific clock.Do not use one LFD for separate DEM, DET and Storage clocks.
Calendar / Working DayConsecutive days / eligible working days under local rules.Treatment of weekends, holidays and terminal closures.

COMMERCIAL MECHANISM

Free Time is a commercial condition linked to equipment and infrastructure use. A shipment may simultaneously be subject to a quotation, booking confirmation, service contract, SPOT terms and an incorporated tariff. Do not assume that one document always prevails; identify the governing document, effective version and accepted terms for the specific booking.

Control principle: one Free Time record per container: charge code + direction + location + equipment + counting basis + start event + end event + free days + rate slabs + governing document.

CMA CGM states that merged D&D does not automatically include Storage or reefer services unless the country tariff says so. By contrast, Maersk Vietnam’s current import tariff defines Demurrage as including terminal storage costs. This difference demonstrates why the carrier-, location- and shipment-specific tariff must be checked instead of relying on a generic definition.

12-FIELD VERIFICATION MATRIX

FieldQuestionPreferred evidenceRisk if omitted
DirectionImport or export?Quotation/bookingWrong operational events.
MechanismSeparate DEM/DET or merged D&D?Tariff/booking termsWrong day allocation.
Free daysHow many for each charge?Booking confirmationOne number applied to all charges.
Day typeCalendar or working days? Is the start event Day 1, or does Day 1 begin on the next day? Are partial days charged?Tariff footnoteOne-day LFD error or incorrect treatment of weekends and holidays.
Start eventDischarge, availability, release, gate-out or empty pick-up?DefinitionIncorrect LFD.
End eventFull gate-out, empty return, full gate-in or load-on-board?DefinitionNo clear clock-stopping action.
LocationPort, terminal, ICD, rail ramp or depot?Routing/bookingWrong local tariff.
Equipment20/40/45, dry/reefer/special/NOR?BookingSpecial equipment terms missed.
StorageIncluded or separate; who bills it?Carrier/terminal tariffUnbudgeted ground rent.
Rate slabsWhat charges apply after free time?Effective tariffNo delay-cost forecast.
Effective basisPCD, booking date, discharge or another date?Validity/PCDObsolete tariff used.
ExceptionsAre holds, terminal/depot closures, rollovers or vessel changes excluded, extended or eligible for relief?Terms/written approvalDisputes during disruption.

IMPORT VERSUS EXPORT FREE TIME

DirectionClockTypical periodControl action
Import – DemurrageFull container inside terminalDischarge/availability/release to full gate-outPrepare D/O, customs, permits and trucking before LFD.
Import – DetentionContainer outside terminalFull gate-out to empty returnPlan unloading and empty-return depot.
Import – Combined D&DOne continuous clockDischarge to empty returnControl pickup, unloading and return as one cycle.
Export – DetentionEmpty equipment outside depotEmpty pick-up to full gate-inDo not collect equipment before cargo is ready.
Export – DemurrageFull container inside terminalFull gate-in to load-on-boardControl CY cut-off, rollover and ETD changes.
Export – Combined D&DOne continuous clockEmpty pick-up to load-on-boardWork backwards from cut-off and ETD.

DOCUMENTS AND DATA TO CHECK

Document/dataIssuer/ownerUseFields to reconcile
QuotationCarrier/NVOCC/forwarderSupplier selectionScope, validity, days, day type, exclusions.
Booking ConfirmationCarrier/NVOCCAfter bookingVessel/voyage, equipment, terminal, SPOT/contract terms.
Service ContractCarrier and customerContract rate shipmentsNamed account, route, commodity, effective period.
D&D TariffCarrierStandard referenceCountry, direction, location, equipment, effective date.
Terminal/Depot TariffTerminal/ICD/depotStorage reviewStorage days, counting basis, pass-through charges.
Tracking EventsCarrier/terminal systemsActual calculationDischarge, availability, gate-out, empty return, load-on-board.
Written exception approvalCarrier/forwarderExtensions/waiversBooking/container, extra days, purchase price and conditions.

SEVEN-STEP PRE-BOOKING REVIEW

1

Define the shipment scope

Record POL/POD, terminal, direction, equipment, commodity, expected ETD/ETA and haulage plan.

2

Separate charge codes

Require DEM, DET/merged D&D, Storage and reefer services to be shown separately.

3

Confirm day counting

Confirm calendar or working days, whether the start event is Day 1 or Day 0, and whether a partial day is charged in full.

4

Confirm start/end events

Write the exact event that starts and stops every clock.

5

Match the effective tariff

Verify country, location, equipment, effective date, PCD and governing rate condition.

6

Calculate test LFDs

Model a normal schedule and a weekend/holiday/rollover scenario, with a separate LFD per charge.

7

Archive acceptance evidence

Retain the quotation, booking confirmation, tariff/version and approval emails with the booking/container reference; obtain written confirmation of precedence where documents differ.

CALCULATING LAST FREE DAY

Do not calculate LFD by mechanically adding days to ETA. First identify the correct start event, day type and Day 1/Day 0 rule in the applicable tariff.

If the start event is Day 1: LFD is the Nth eligible day counted from the start event; for calendar days, this equals start date + (N − 1) days.
If the following day is Day 1: LFD is the Nth eligible day after the start event; for calendar days, this equals start date + N days.
For working days: count only days treated as working days under the tariff; do not derive the result by ordinary calendar-day addition.

The first chargeable day is usually the next chargeable day after LFD under the same day-count basis. Some tariffs charge every day or part thereof in full, so event timestamps, cut-offs and partial-day rules must also be checked.

Operational example: where import Demurrage “commences on and includes the day of discharge,” discharge is Day 1; where Detention starts “on and includes full gate-out,” gate-out may also be Day 1. Never transfer the DEM LFD to DET where the clocks are separate.

HOW TO READ QUOTATION WORDING

WordingAssessmentMissing information
“7 days free time”InsufficientCharge, day type, start/end, equipment and location.
“7 calendar days combined D&D, import dry”Basic mechanism is clearStart/end events, Storage, effective basis and rate slabs.
“DEM 5 days + DET 3 days”Clocks are separatedDay 1, events, Storage and terminal/depot.
“As per carrier tariff”Budget not lockedCarrier, tariff version/link, location and PCD.
“Special free time subject to approval”Not yet effectiveApprover, deadline, purchase price and written evidence.

RISKS AND COMMON ERRORS

ErrorCauseImpactControl
Using ETA for every LFDStart event not reviewedWrong deadlineUse actual carrier/terminal event.
Combining DEM, DET and StorageShort quotation wordingIncomplete budgetBuild a charge matrix.
Ignoring calendar daysAssuming business daysWeekend/holiday chargesRecord day type.
Applying one term to all containersEquipment/location not checkedReefer/special exceptionsTrack each container.
Relying only on public tariffSPOT/contract not reviewedWrong governing termArchive shipment-specific terms.
No written extension approvalVerbal confirmationWeak dispute evidenceObtain booking-referenced approval.
No update after rolloverSchedule changeLonger export D&DMonitor ETD/cut-off and request confirmation.

OFFICIAL SOURCES AND LEGAL SCOPE

SourceScopeUse
CMA CGM – General D&D TermsCarrier termsDefinitions, events and calendar/working-day conventions.
Maersk Vietnam – Import / ExportLocal information, effective until changed on the pageCheck start/end events, calendar days, PCD, equipment, Storage treatment and SPOT terms.
Hapag-Lloyd – D&D TariffsCountry tariff portalCurrent tariff and additional free time.
FMC – U.S. D&D billing updateUnited States jurisdiction onlyInvoice-content and issuance-deadline reference.
United States note: the 2025 court decision set aside only 46 C.F.R. 541.4; the remaining FMC billing requirements continue in effect. They are not universal rules for non-U.S. shipments.

FAQ

Does “7 free days” automatically cover both DEM and DET?

No. Verify whether the term is separate or merged D&D.

Does D&D free time include Storage?

Only when the tariff or quotation expressly says so.

Is ETA always the demurrage start date?

No. The governing term may use discharge, availability, release or another event.

Are weekends and holidays excluded?

Only under the applicable working-day convention; calendar days normally run consecutively.

Do SPOT bookings use the public standard tariff?

Not necessarily. Accepted SPOT or booking conditions may differ.

Can separate DEM and DET days be added together?

Not as one flexible pool unless the term expressly provides combined D&D.

When should extra free time be purchased?

Before booking or the carrier’s deadline, after modelling customs, unloading, delivery and empty return.

APPLICATION NOTE: Actual terms depend on the carrier/NVOCC, country, terminal/depot, direction, equipment, service contract, SPOT terms, PCD and actual events. Where documents differ, require written confirmation of which document governs the specific booking; do not assume that a quotation always overrides a tariff or vice versa.

TGIMEX IMPLEMENTATION SUPPORT

TGIMEX helps businesses turn the article into a shipment-ready checklist, covering input-data review, dossier preparation, milestone control, and coordination with the relevant parties.

Convert guidance into checks

Assign an owner and deadline to every operational control point.

Reconcile shipment data

Compare booking, transport, commercial, customs, and delivery evidence.

Manage operational risk

Record discrepancies, actions, and decision evidence to prevent recurrence.

QUICK CONSULTATION

NEED TO REVIEW IMPORT PROCEDURES OR A SHIPPING PLAN?

Send us the product name, shipping route, current dossier, or implementation request in advance so we can suggest a suitable approach that is practical, focused, and aligned with your shipment.

CALL NOW
Zalo
HOTLINE 0963 856 664 / 0982 135 393
EMAIL info@tgimex.com
SUITABLE FOR International shipping · Customs procedures · Import licenses · B2B logistics

Leave a Reply

Discover more from TGIMEX VIETNAM JSC

Subscribe now to keep reading and get access to the full archive.

Continue reading