Import procedure guide for pressure vessels

Machinery · Pressure equipment · Pressure vessel

IMPORT PROCEDURE GUIDE FOR PRESSURE VESSELS

A pressure vessel is not a generic steel tank. If the importer only declares “pressure tank”, “air receiver” or “industrial vessel” without locking design pressure, working pressure, capacity, medium, material, manufacturing standard, nameplate, certificates and new/used condition, the shipment may face HS queries, technical dossier requests, C/O rejection, specialized safety questions or DEM/DET due to late document correction. This guide gives an E2E review map before ETA, covering HS code, duty, C/O, specialized policy, dossier set, customs workflow and key risks to block before arrival.

QUICK FACTS

ItemQuick review content
ProductIndependent industrial pressure vessel: air receiver, pressure tank, accumulator, separator vessel, surge tank or vessel for compressed air, water, oil, steam condensate or other industrial media.
Key policy thresholdReview carefully where rated working pressure is higher than 0.7 bar, excluding hydrostatic pressure, or where the goods fall under equipment subject to strict occupational safety requirements.
Reference HSDepending on product nature: 7309.00.99, 7310.29.99, 7311.00.99, 8419.50.91, 8419.89.19 or another code where the vessel is part of boilers, thermal equipment or refrigeration systems.
Reference dutiesCommon MFN references: 0% for some containers under 7311, 5% for 7309.00.99, 10% for 7310.29.99, 3% or 0% for selected 8419 equipment; standard VAT 10%.
Key compliance pointDo not conclude “no permit / no inspection” without reviewing the file. Pressure vessels may require technical dossiers, safety inspection before use and declaration of use with the local Department of Home Affairs where applicable.
CautionDo not apply this guide to boilers, thermal oil heaters, gas tanks/cylinders, refrigeration systems, steam/hot-water/gas piping, LPG cylinders or explosion-proof equipment without separate review.
Illustration for Import procedure guide for pressure vessels
Illustration of the product group and document review before customs clearance.

SCOPE OF APPLICATION

This guide covers independent pressure vessels imported for factory installation, replacement, industrial utilities, compressed-air stations, process lines, MEP projects or industrial resale. The review should cover vessel body, heads, nozzles, flanges, safety valve, pressure gauge, supports, accessories and the manufacturer’s technical dossier.

  • New, used, refurbished, warranty, sample and project cargo may trigger different requirements.
  • If electrical cabinets, sensors, solenoid valves, motors, pumps, compressors or refrigeration assemblies are imported together, review them separately.
  • Oversized/overweight pressure vessels require packing, lifting, lashing, OOG/Flat Rack/Open Top and inland transport planning.
  • Where data is insufficient, record: Review is required based on catalogue, datasheet, model and actual import purpose.

CLASSIFICATION & TECHNICAL IDENTIFICATION

Classification must be based on the technical nature of the vessel, not on marketing names. Key data include design pressure, working pressure, hydrostatic test pressure, capacity, medium, material, wall thickness, manufacturing standard, year of manufacture, serial number, nameplate, safety valve and factory inspection documents.

CheckpointDocuments to reviewRisk if described incorrectlySuggested customs/commercial description
Pressure ratingDatasheet, nameplate, drawing, certificateFailure to identify occupational safety scope or applicable QCVNPressure vessel / air receiver, design pressure … bar, working pressure … bar
Capacity and dimensionsCatalogue, GA drawing, packing listWrong HS between 7309/7310/7311 and wrong transport planCapacity … L/m³, dimension …, net/gross weight …
Medium containedSpecification, P&ID, user manualConfusion between gas container and ordinary liquid tankFor compressed air/nitrogen/water/oil/steam condensate…
Material and manufacturing standardMaterial certificate, ASME/EN/JIS/TCVN documents, welding recordInsufficient basis for safety inspection after importCarbon steel/stainless steel, standard ASME VIII/EN 13445/TCVN…
ConditionInvoice, photos, serial, year of manufactureUsed/refurbished goods may trigger used machinery policyBrand new / used / refurbished pressure vessel; year …
AccessoriesPacking list, accessory list, photosSafety valves, sensors or electrical parts may trigger separate HS/policyWith safety valve, pressure gauge, no electrical control unless stated

HS CODE – DUTY – C/O

HS code depends on whether the goods are containers for compressed/liquefied gas, ordinary tanks, small containers, heat exchangers, process equipment or parts of a larger system. Do not use one HS code for every pressure vessel.

Reference HS codeApplication conditionRisk if incorrectDocuments to review
7311.00.99Iron/steel containers for compressed or liquefied gas, other type; may apply to air receivers or industrial gas pressure containers where appropriateWrong policy and duty if the goods are actually tanks, heat exchangers or gas cylinders under another lineNameplate, pressure rating, medium, drawing, catalogue, packing list
7309.00.99Iron/steel tanks/vats over 300 liters, not for compressed/liquefied gas and not fitted with mechanical/thermal equipmentIncorrect if the vessel contains compressed gas or has mechanical/thermal equipmentCapacity, medium, structure, photos, drawing
7310.29.99Iron/steel containers not exceeding 300 liters, other type, where not classified in 7311 or machinery headingsIncorrect if it is a gas cylinder or specialized equipmentCapacity, use purpose, material, pressure data
8419.50.91 / 8419.50.99Where the vessel is in fact a heat exchangerWrong if it is merely a pressure containerP&ID, thermal duty, heat exchange surface, drawing
8419.89.19 / 8419.89.99Equipment for treatment of materials by change of temperature where applicableWrong if the item only stores pressureFunction description, process flow, datasheet
Other code by main equipmentWhere the vessel is part of boilers, refrigeration systems, compressors or production linesSplitting/combining parts incorrectly may affect policyContract, BOM, system drawing, spare part list

REFERENCE DUTY TABLE

HS / scenarioReference MFN import dutyReference ordinary dutyVATFTA preference with valid C/OApplication note
7311.00.990%Check the ordinary tariff line at declaration date; some references show 5%10%May be 0% under many FTAs if C/O is validSeparate pressure vessels from gas cylinders/tanks where policy differs
7309.00.995%7.5% reference where 150% MFN principle applies10%May be 0% or staged by FTAOnly where not for compressed/liquefied gas and no mechanical/thermal equipment
7310.29.9910%15% reference10%FTA rate if eligibleCheck capacity and technical nature
8419.50.913%4.5% reference10%FTA rate if eligibleOnly for heat exchangers
8419.89.190%Check specific ordinary duty at declaration date10%FTA rate if eligibleOnly where the main function is thermal treatment

APPLICABLE SPECIALIZED POLICY

Goods scenarioPossible policyDocuments to checkAuthority / portal if identifiableRecommended timingRisk note
Pressure vessel with working pressure > 0.7 barStrict occupational safety equipment; QCVN 01:2008/BLDTBXH; TCVN 8366:2010Datasheet, drawing, nameplate, certificates, welding and pressure test recordsSafety authority / Department of Home Affairs for declaration of use; designated inspection body for safety inspectionBefore ETA and before useMissing technical file may block post-import inspection/use
Pressure vessels in Section II of Circular 01/2021May not be subject to state quality inspection at import, but QCVN and safety inspection obligations still need reviewHS, pressure, capacity, TCVN 8366 classificationCustoms; safety authority after clearanceBefore declarationDo not treat this as exemption from all safety duties
Gas cylinder/gas tank/LPG vesselMay trigger different quality inspection or gas container policyGas type, cylinder standard, valve, volume, pressureSpecialized authority by HS and goods natureBefore bookingMove to gas tank/cylinder review if applicable
Used/refurbished goodsUsed machinery policy under Decision 18/2019 and Decision 28/2022 where applicableYear, condition report, inspection certificate, remaining lifeCustoms; inspection body if requiredBefore contractRisk of failing age/standard requirements
Vessel with electrical/control/refrigeration partsPossible electrical, energy, conformity or refrigeration policiesBOM, circuit diagram, catalogue, accessory listCustoms and specialized ministry depending on equipmentBefore ETAAccessories may change HS/policy
Project/OOG cargoLifting, lashing, insurance, special transport planningPacking drawing, lifting point, dimensions, weightForwarder, port, carrier, inland truckerBefore ETDIncorrect dimensions/weight create cost and delay risk

LEGAL DOCUMENTS TO REVIEW

Document groupDocument name/numberIssuing authorityEffective timingRole in procedureKey pointsReview note
LawLaw on Occupational Safety and Hygiene 84/2015/QH13National AssemblyEffective from 01 Jul 2016Framework for strict safety equipment, inspection and use declarationSafety inspection and user obligationsCheck amendments/guidance
DecreeDecree 44/2016/ND-CPGovernmentEffective 01 Jul 2016Technical safety inspection, OSH training and working environment monitoringInspection of strict safety equipmentCheck Decree 4/2023 where relevant
Current management structureDecree 25/2025/ND-CP; Decision 120/QD-BNV of 2025Government / Ministry of Home AffairsApplies under the 2025 organizational structureIdentifies the current focal agency for occupational safety and health administrationThe Department of Employment under the Ministry of Home Affairs performs occupational safety management functionsKeep MOLISA names for original instruments, but check current procedures with Ministry/Department of Home Affairs agencies
CircularCircular 36/2019/TT-BLDTBXHMOLISAEffective from 01 Mar 2020Lists pressure vessels with rated working pressure above 0.7 barSection I listFrom 01 Mar 2025, occupational safety management functions are under the Ministry of Home Affairs / Department of Employment; original legal instruments remain issued by MOLISA
CircularCircular 01/2021/TT-BLDTBXHMOLISAEffective 18 Jul 2021Group-2 products and import quality inspection measuresArticle 4 and Sections I/II of appendixPressure vessels may be in the non-import-quality-inspection section; however conformity certification/declaration and safety inspection before use remain critical
QCVNQCVN 01:2008/BLDTBXH under Decision 64/2008/QD-BLDTBXHMOLISAIssued 27 Nov 2008Safety regulation for boilers and pressure vesselsScope and 0.7 bar thresholdApply only where product falls within scope
StandardTCVN 8366:2010 Pressure vessels – design and manufacture requirementsVietnam standard systemCheck current standard statusTechnical basis for design/manufacturing reviewPressure, materials, manufacturing and testingCompare with ASME/EN/JIS standards if used by manufacturer
Used machineryDecision 18/2019/QD-TTg and Decision 28/2022/QD-TTgPrime MinisterDecision 28 effective 01 Mar 2023Used machinery import controlAge/standard/inspection conditionsOnly if goods are used/refurbished
Operational guidanceDispatch 322/ATLD-QCKD of 2023Department of Occupational SafetyIssued in 2023Guidance on quality inspection registration for pressure vessels/air receiversIndicates no state quality inspection at import under Section II of Circular 01/2021, but conformity certification and declaration are required before useUse as operational guidance; actual dossiers and current regulations must still be reviewed
TariffDecree 26/2023/ND-CP; Decree 199/2025/ND-CP and amendmentsGovernmentDecree 26 effective 15 Jul 2023; Decree 199 effective 08 Jul 2025MFN tariff basisChapters 73 and 84Check at declaration date

VIEW / DOWNLOAD ORIGINAL LEGAL TEXTS

Enterprises should cross-check the documents on official legal portals or issuing authority websites before applying them.

CUSTOMS CLEARANCE DOCUMENT SET

Commercial documents
  • Commercial Invoice
  • Packing List
  • Bill of Lading / Air Waybill
  • Sales Contract / Purchase Order
  • C/O if claiming preferential duty
  • Product photos, original label and nameplate
Technical dossier
  • Catalogue / datasheet
  • GA/detail drawing
  • Material and welding certificates
  • Hydrostatic / pneumatic test report
  • Factory inspection certificate / COC / CQ
  • User and installation manuals
Specialized dossier if any
  • Safety inspection plan before use
  • Use declaration dossier
  • Used machinery dossier if any
  • OOG transport dossier if oversized
  • Label/nameplate dossier
File groupRequired documentsUsed forUsually prepared byCommon errorPre-ETA check
CommercialInvoice, Packing List, Contract/POCustoms value, quantity and trade termsImporter/Docs/SalesGeneric goods name; missing pressure/capacity/modelMatch description with catalogue/nameplate
TransportB/L/AWB, arrival notice, pre-alertManifest, delivery order, ETA trackingForwarder/CarrierWrong dimensions/weight or missing OOG dataApprove draft transport documents
TechnicalDatasheet, drawing, certificates, test reportsHS, policy and post-import inspectionSupplier/Engineering/QANo pressure, capacity or manufacturing standardRequest full technical pack before ETD
HS–tax–C/OHS memo, draft C/O, catalogue, labelDuty and FTA reviewCompliance/BrokerC/O HS/description mismatchCheck draft C/O after HS finalization
OSH safetyQCVN/TCVN mapping, inspection/use declaration planSafety inspection and use declarationImporter/HSE/EngineeringDiscovering missing inspection documents after clearancePrepare inspection checklist before arrival

Control principle: Goods name, quantity, model, serial, pressure, capacity, material, origin and technical standard must match across commercial documents, catalogue, nameplate, specialized dossier and customs declaration.

DECISION POINTS THAT MAY HOLD THE SHIPMENT

Decision pointQuestion to answerEvidenceConsequence if unclearRecommended handling
HS basisIs it 7309, 7310, 7311 or 8419?Datasheet, drawing, pressure/capacity, purposeHS query, duty adjustment or C/O issuePrepare HS memo before ETA
Strict safety scopeIs working pressure above 0.7 bar?Nameplate, certificate, QCVN/TCVN mappingSafety dossier request or use delayReview QCVN 01 and Circular 36
Gas cylinder/tank natureIs it for compressed or liquefied gas?Medium, valve, cylinder standardWrong import quality policySeparate gas container policy if applicable
New or usedIs it new, used or refurbished?Invoice, photos, serial, inspection reportUsed machinery policy riskConfirm condition before contract
C/O validityDoes C/O match form, HS, description and origin?Draft C/O, invoice, B/L/AWBFTA preference deniedCheck draft C/O after HS finalization
Post-import inspection fileIs the technical pack sufficient for safety inspection?Datasheet, drawing, test report, certificatesCannot put equipment into use on timeObtain technical pack before shipment

PRACTICAL E2E WORKFLOW

Pre-ETA review.

Finalize HS, duty, C/O, safety policy, new/used status, labels, transport plan and post-import inspection requirements.

Lock documents and technical files.

Finalize Invoice, Packing List, B/L/AWB, catalogue, datasheet, drawing, nameplate, model/serial list, certificates and test reports.

Prepare specialized dossiers if any.

If import quality inspection, used machinery review or other specialized requirements apply, prepare them before ETA. Even without import quality inspection, prepare safety inspection/use declaration documents.

Lodge customs declaration.

Green: conditional system clearance. Yellow: document check. Red: document and physical inspection. Common queries cover value, HS, pressure, capacity, nameplate, C/O and group-2 policy.

Clear, deliver, inspect and archive.

Deliver to warehouse/site, check serial/nameplate, arrange safety inspection before use, declare use where applicable and archive batch documents.

PRE-ETA RISK CHECKLIST

RiskConsequencePre-ETA preventionDocuments to check
Generic goods nameWrong HS/policy and technical queryState vessel type, pressure, capacity and mediumInvoice, packing, catalogue, nameplate
Missing technical dossierWeak HS explanation and failed post-import inspectionRequest full technical pack before ETDDatasheet, drawing, hydro test, COC/CQ
Confusing pressure vessel with gas cylinderWrong quality inspection policyIdentify medium, valve and product standardSpecification, valve list, cylinder standard
C/O mismatchFTA preference deniedCheck draft C/O after final HSC/O, invoice, B/L/AWB
Used/refurbished not reviewedUsed machinery policy riskConfirm condition and year of manufactureInvoice, serial, photos, inspection report
OOG handling not plannedBooking failure and port/trucking costReview dimensions, weight and lifting pointsPacking drawing, lifting drawing, route survey

FAQ

QuestionShort answer
Does importing a pressure vessel require a permit?Do not answer absolutely. Review HS, QCVN, strict safety scope, inspection/use declaration and new/used condition based on the dossier.
Is state quality inspection required at import?Pressure vessels under Section II of Circular 01/2021 are generally not subject to state quality inspection at import, but conformity certification/declaration, technical safety inspection and use declaration must still be prepared before use.
Is conformity certification required?For pressure vessels within the relevant scope, conformity certification/declaration may be required before use, together with technical safety inspection. Pressure, capacity, medium, manufacturing standard and use purpose are required for conclusion.
Is safety inspection required before use?If the vessel is strict safety equipment, technical safety inspection before use and use declaration, usually within 30 days from putting the equipment into use, may be required.
Can C/O reduce duty?Potentially, if C/O form, origin criterion, HS, goods description and direct transport are valid under the relevant FTA.
What if invoice model differs from nameplate?Correct the documents before ETA. Model/serial/nameplate discrepancies often trigger customs or inspection questions.

TGIMEX IMPLEMENTATION SUPPORT

This guide provides a map for HS code, duty, dossier and specialized policy for imported pressure vessels. Actual shipments still require review by catalogue, datasheet, model, documents, origin and import purpose.

Operational capability signals

Agent network in more than 60 countries; membership in WCA, WCA China Global, VLA and HNLA; capability to coordinate sea, air, road and rail transport.

Pre-ETA review

HS, group-2 policy, duty, C/O, new/used status, labeling and technical dossier.

Compliance dossier control

Cross-check Invoice, Packing List, B/L/AWB, C/O, catalogue, datasheet, drawing, nameplate and certificates.

International logistics

Coordinate agents, carriers, pre-alert and OOG/Flat Rack/Open Top planning where required.

Customs declaration

Prepare customs dossier and support Green/Yellow/Red channel handling and technical explanations.

Post-clearance records

Archive batch documents and support safety inspection/use declaration preparation.

For technical equipment, document review should not start only after cargo arrival. A small mismatch among invoice, packing list, catalogue, datasheet, nameplate, C/O or certificate may trigger additional documents, clearance delay or unplanned costs.

QUICK CONSULTATION

NEED TO REVIEW IMPORT PROCEDURES OR A SHIPPING PLAN?

Send us the product name, shipping route, current dossier, or implementation request in advance so we can suggest a suitable approach that is practical, focused, and aligned with your shipment.

CALL NOW
Zalo
HOTLINE 0963 856 664 / 0982 135 393
EMAIL info@tgimex.com
SUITABLE FOR International shipping · Customs procedures · Import licenses · B2B logistics